Over two days in mid July '06, Jamie, Murray and George upgraded the Pirongia to McGregors link from 2.4GHz to 5.8GHz. This also required an upgrade from an Advantech to Soekris at MCG.
Last changed on 07/25/06. This album contains 33 items. This album has been viewed 12100 times since 07/25/06.
Murray and Daniel headed to Murupara to fix the solar site at the top of Mount Tawhiuau which had stopped responding. It turned out that a solar controller had stopped working. A new solar controller and batteries were fitted at the site. While the Batteries were Choppered in Murray, Daniel and BJ (the local electrican) had to walk two hours to get to the top
Last changed on 03/14/07. This album contains 29 items. This album has been viewed 14162 times since 06/30/05.